Browsing by Subject Critical Path, Time Cost Trade Off
Showing results 1 to 1 of 1
Issue Date | Title | Author(s) |
---|---|---|
2020-04 | OPTIMALISASI BIAYA DAN WAKTU P ADA PROYEK KONTRUKSI PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF | Putu Agus; I Wayan Muka; Made Novia Indriani3 |