Please use this identifier to cite or link to this item: http://repo.unhi.ac.id/jspui/handle/123456789/2004
Title: Jabfung I Wayan Muka 7
Issue Date: 2021
URI: http://repo.unhi.ac.id/jspui/handle/123456789/2004
Appears in Collections:Arsip Lain

Files in This Item:
File Description SizeFormat 
OPTIMALISASI BIAYA DAN WAKTU.pdfOPTIMALISASI BIAYA DAN WAKTU PADA PROYEK KONTRUKSI PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF3.1 MBAdobe PDFView/Open
ANALISIS KONSTRUKSI.pdfANALISIS KONSTRUKSI BERTAHAP PADA PORTAL BERTINGKAT SIMETRIS DENGAN PENAMABAHAN PERKUATAN SHEAR WALL5.14 MBAdobe PDFView/Open
PENGARUH PENGALAMAN TENAGA KERJA.pdfPENGARUH PENGALAMAN TENAGA KERJA TERHADAP KINERJA KONTRAKTOR PADA PROYEK KONSTRUKSI VILLA (Study Kasus _ Pembangunan Villa Menaro's House, PT. Cipta Kreasi Bangun Pratama)2.79 MBAdobe PDFView/Open
PERBANDINGAN WAKTU DAN BIAYA.pdfPERBANDINGAN WAKTU DAN BIAYA PADA PEKERJAAN PASANGAN DINDING DENGAN METODE TIME STUDY PADA PROYEK KONTRUKSI GEDUNG2.48 MBAdobe PDFView/Open
ANALISIS BIAYA OPERASIONAL.pdfANALISIS BIAYA OPERASIONAL KENDARAAN DAN BIAYA KEMACETAN KENDARAAN DI JALAN RAYA SEMINYAK KABUPATEN BADUNG3.06 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.